Casagrande C6XP Driving Wheel for Bored pile
Product Description:
Product Name: Driving Wheel
Product model: Casagrande C6XP
Material: 40Mn2;35SiMn;ZGSCSiMn2H
Colors:Black/Customer Requirement
Warranty time: 1 years/2500 working days
Payment Term:TT;LC;Negotiate
Business Scope: Drilling rig, Crawler Crane, Bulldozer, Excavator
Casagrande C6XP Model:
B180, B180HD, B250, B250XP, B300, B400, C6XP, C7XP, C25, C30, C50, C60, C60HD, C90, C250, C400, C600, C600ZN, etc.
Production Process and Quality Inspection:
1.Advanced production equipment: We have advanced production equipment and processes, including CNC machine tools and precision machining equipment, ensuring the dimensional accuracy and smooth surface of the sprocket drive.
2.High-Quality Raw Materials: We use high-quality steel, which has excellent strength and wear resistance and can withstand high-intensity working conditions.
3.Strict quality control: We implement strict quality control processes from raw material procurement to final product manufacturing to ensure that each tumbler drive meets the quality requirements of international marks.
4.Comprehensive quality inspection: We conduct comprehensive quality inspection, including dimensional measurement, hardness testing and wear resistance testing, to ensure that each Drive gear has excellent durability and reliability.
5.ISO Certification: Our production and quality management systems comply with ISO 9001 certification requirements, ensuring product consistency and quality performance.
Drilling Rig Undercarriage Maintenance:
1. When stopping work in a short period of time, a small amount of compressed air should be given to prevent sediment from invading the inside of the drilling rig impactor. If the drilling rig operation is stopped for a long time, the impactor should be raised 1-2 meters away from the bottom of the hole and fixed.
2. Always check the lubricating oil condition of the wind motor.
3. When the working surface is immersed in water, use a large-diameter drill bit when opening the hole and insert the drill pipe so that the drill pipe is 1-2 meters above the water surface to prevent mud and rock slag from falling into the hole.
4. No reversal is allowed during drilling operations to prevent the drill pipe from falling into the hole;
5. Always check the water and gas pipelines of the crawler drilling rig to see if the bolts and nuts of each accessory are tight.
Reviews
There are no reviews yet.