IMT AF200 Drive Sprocket for Bored pile

IMT AF200 Sprocket

IMT AF200 Drive Sprocket for Bored pile

 

The IMT AF200 Drive Sprocketis a high quality accessory designed and manufactured specifically for the IMT AF200 Piling Drilling Rig. This sprocket is used to drive the chain of a pile drilling rig, providing reliable power transmission and precise motion control to complete pile work efficiently.

 

Product Name: Sprocket

Product Information:Drilling Rig Undercarriage Parts
Material:40Mn2;35SiMn;ZGSCSiMn2H
Finish:Smooth
Colors:Black / Customer Requirement
Warranty time:1 years/2500 working days
Certification:ISO9001
MOQ:1 PCs
Delivery Time:15-25days after payment
Package:Pallet / Plywood Case
Payment Term:TT;LC;Negotiate

Pictures for Sprocket Details:

Advanced Casting Technology:

Yantai Orient uses a casting process for the sprocket to achieve complex shapes and designs, ensuring dimensional accuracy. At the same time, the strength and wear resistance of the Drive gear are improved through the casting process, allowing the sprocket drive to withstand greater loads and resist longer wear. The casting process also ensures tumbler drive consistency and quality stability, meaning each Drive Wheel’s performance is predictable. At the same time, casting can provide higher structural stability, reduce the risk of deformation and damage of the sprocket during use, increase the service life, and reduce the time loss of the project.

soilmec parts heat treatment

Drilling Rig Undercarriage Maintenance:

1. When stopping work in a short period of time, a small amount of compressed air should be given to prevent sediment from invading the inside of the drilling rig impactor. If the drilling rig operation is stopped for a long time, the impactor should be raised 1-2 meters away from the bottom of the hole and fixed.
2. Always check the lubricating oil condition of the wind motor.
3. When the working surface is immersed in water, use a large-diameter drill bit when opening the hole and insert the drill pipe so that the drill pipe is 1-2 meters above the water surface to prevent mud and rock slag from falling into the hole.
4. No reversal is allowed during drilling operations to prevent the drill pipe from falling into the hole;
5. Always check the water and gas pipelines of the crawler drilling rig to see if the bolts and nuts of each accessory are tight.

 

Reviews

There are no reviews yet.

Be the first to review “IMT AF200 Drive Sprocket for Bored pile”

Your email address will not be published. Required fields are marked *

Scroll to Top